Construction of Chengdu Metro's Line 19 Phase II Project concludes

0 Comment(s)Print E-mail China.org.cn, November 17, 2023
Adjust font size:

The construction of the stations of Line 19 Phase II Project of Chengdu Metro has concluded as of Nov. 15, according to Chengdu Rail Transit, operator of the subway system in the capital of southwest China's Sichuan province.

The Line 19 Phase II Project, which is 43.17 kilometers long, and has 12 stations, among which seven are interchange stations, connects Wenjiang and Shuangliu districts, as well as Tianfu New Area of Chengdu.

Before the end of this year, Line 19 Phase II Project that connects the two airports of Chengdu, Tianfu and Shuangliu international airports, will be put into trial operation.

The design of the stations integrates various cultural elements such as mountains, water, fields and gardens to create a subway line that fully highlights the cultural characteristics of Chengdu that emphasizes nature and harmony.

The architects apply such elements as water wave lines, plant patterns and cultural symbols to echo the theme, as well as other art works related to natural themes and traditional Chinese colors such as blue and indigo to create a comfortable and pleasant space for passengers through effective collocation and combination with space art installations.

In the stations, some barrier-free designs are widely used to improve traveling experiences of minors, elderly and physically challenged passengers. 


Follow China.org.cn on Twitter and Facebook to join the conversation.
ChinaNews App Download
Print E-mail Bookmark and Share

Go to Forum >>0 Comment(s)

No comments.

Add your comments...

  • User Name Required
  • Your Comment
  • Enter the words you see:   
    Racist, abusive and off-topic comments may be removed by the moderator.
Send your storiesGet more from China.org.cnMobileRSSNewsletter