Project Name: National Stadium

Project Legal Person:
National Stadium Co. Ltd. Established by Beijing State-owned Assets Management Co. Ltd and CITIC Group Federation, the company is mainly responsible for investment, financing, construction, operation and management of the National Stadium; The shareholders of the company consist of Beijing State-owned Assets Management Co. Ltd, which holds 58 percent of shares, and CITIC Group Association, which hold the rest 42 percent, of which 25 percent is foreign investment. It is a Sino-Foreign joint cooperation company approved by the authority.

Project Venues: Locating in the Olympic Green.

Construction Scale:
Construction area will be 258,000 square meters.

Construction Schedule:
The project started construction at the year-end of 2003, it is planned to complete by the end of 2007.

Project Purpose:
Holding opening and closing ceremonies of the 2008 Olympic Games, track and field events etc.

Utilization after Olympic Games:
Undertaking special and important sports events, various routine competitions and non-competition events, a large-scale professional place for the citizens to take part in sports and enjoy sports and cultural recreation. It will be a symbolic sports and recreation building.

Project Progress: The piling construction has been completed.

Procurement Information:
Main building: steels for steel structure, reinforcing steel bars for the concrete structure and commercial concretes.
Strong current: passenger conveyor, freight lift, escalator etc..
Gas power: loaded pressure adjustment devices, turbine compelled manual ball valves, manual ball valves.
Weak current: monitoring system equipments of construction equipments, automatic fire alarming systems, security systems, etc..
Ventilation and air conditioning: duplex mode water-cooling units, ground source heat pump water-cooling units, cooling water pumps etc.
Water supply system: transformer variable frequency conversion life water supply devices, stainless steel life water tanks, external water tank self-cleaned sterilizing equipment etc.

Address: No.1, Huayuan Lu, Beichen Donglu, Chaoyang District, Beijing
Post Code: 100101
Tel: 86-10-8498 6888
Fax: 86-10-8498 8188
Contact Department: Contract Department
Contact Person: Li Cheng

Note: The procurement information was released at the International Forum on the Construction & Operation of Olympic Stadiums held in Beijing on April 18, 2005.

(China.org.cn April 20, 2005)

Print This Page | Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688