Discharge and Treatment of Waste Water, Waste Gas and Solid Wastes by Industry Enterprises at and Above County Level
 
Item 1995 1998 1999 2000
Waste Water



 
Total Volume of Industrial Waste Water Discharged (10 000 tons) 2218943 1712355 1607678 1530558
Volume of Industrial Waste Water up to        
the Standards for Discharge (10 000 tons) 1228680 1146769 1158703 1257294
Percentage of Industrial Waste Water up to        
the Standards for Discharge (%) 55.4 67.0 72.1 82.1
Total Volume of Industrial Waste Water Treated (10 000 tons) 2156615 2624105 2778021 3137881
Percentage of Industrial Waste Water Treated (%) 76.8 88.2 91.1 95.0
Volume of Treated Industrial Waste Water up        
to the Standards for Discharge (10 000 tons) 481428 627918 719927 914610
Waste Gas


 
Total Volume of Industrial Waste Gas Emission (100 million cu.m) 107478 110807 114721 123151
Volume of Sulphur Dioxide Emission (10 000 tons) 1405 1210 1078 1149
Volume of Soot Emission (10 000 tons) 838 680 557 517
Volume of Industrial Dust Emission (10 000 tons) 639 506 458 404
Solid Wastes


 
Volume of Industrial Solid Wastes Produced (10 000 tons) 64474 63648 64905 66599
Volume of Industrial Solid Wastes Utilized (10 000 tons) 28511 30716 33240 34482
Percentage of Industrial Solid Wastes Utilized (%) 42.9 48.3 51.7 51.8
Volume of Industrial Solid Wastes Accumulated (10 000 tons) 24779 25805 24811 27456
Volume of Industrial Solid Wastes Treated (10 000 tons) 14204 9062 9747 8232
Volume of Industrial Solid Wastes Discharged (10 000 tons) 2242 1821 1154 1040
Areas Occupied by Industrial Solid Wastes


 
Accumulated (10 000 sq.m) 55440 64756 62010 57763
Output Value of Products Made from Waste Gas,        
Waste Water and Solid Wastes (10 000 yuan) 2036052 2364461 2180111 2628477
Profits Obtained from Use of Waste Gas,        
Waste Water and Solid Wastes (10 000 yuan) 527223 443037 465334 539070
Pollution Treatment


 
Number of Projects for Pollution Treatment in the Year 21644 14374 19866 27243
Number of Projects for Pollution Treatment in the Year


 
Actual Investment in Implementation of the Project        
for Pollution Treatment in the Year (10 000 yuan) 987376 1220461 1527306.9 2394391
Treatment of Waste Water 455909 716794 688301.6 1095897
Treatment of Waste Gas 331560 323814 509847.3 909242
Treatment of Solid Wastes 140769 87242 83353.6 114673
Noise Abatement 21528 7658 9213.2 60189
Others 37611 84953 235075.1 214390
Fee for Discharging Waste and Fines for Pollution


 
Number of Units Charged levied 368213 652863 722375 739193
Amount of Pollution Charges (10 000 yuan) 371280 490192 554512.83 579607
Outlays of Pollution Levy Charges (10 000 yuan) 345812 486142 545870.17 613630