Engineers communicate by Haiyang Shiyou 122, Asia's first cylindrical floating, production, storage, and offloading (FPSO) facility, in Qingdao, east China's Shandong Province, Dec. 4, 2023. Designed and manufactured in China, Haiyang Shiyou 122 has entered its final assembly phase recently in Qingdao. With a diameter of about 90 meters and designed displacement of 100,000 tonnes, the facility is capable of operating for 15 years at sea without returning to the dry dock. (Xinhua/Li Ziheng)
Go to Forum >>0 Comment(s)