2nd turbine launched at Three Gorges Dam
-
- Xinhua, June 4, 2011
Photo taken on June 2, 2011 shows an overhead view of the underground operation floor of the Three Gorges Dam hydropower plant. A second underground turbo-generator, namely No.31 Power Unit, was put in operation on Thursday at the dam. [Photo: Xinhua]